Pricing & Margin
Job-cost overruns
We ask: Do you track committed cost vs. budget while a job is in progress (WIP)?
A first fix: Start a weekly WIP report: budget, committed, invoiced, and % complete per job.
Residential Construction
Most residential builders don't find out a job lost money until closeout. By then the overruns, late draws and leftover materials are already baked in. The diagnostic shows where your jobs are most likely bleeding margin while there's still time to fix it.
Built for residential builders, remodelers and specialty contractors
The construction diagnostic adds these industry questions to the core assessment, prices each one against your numbers, and ranks them by what they're worth to fix.
Pricing & Margin
We ask: Do you track committed cost vs. budget while a job is in progress (WIP)?
A first fix: Start a weekly WIP report: budget, committed, invoiced, and % complete per job.
Cash Flow & Collections
We ask: How quickly are draws requested and retainage collected?
A first fix: List all outstanding retainage and draw requests and assign collection dates.
Purchasing & Supply
We ask: How are leftover materials and returns handled?
A first fix: Track job-site leftovers and require returns / credits within 10 days of completion.
Labor & Productivity
We ask: How often do crews wait on subs, inspections, or materials?
A first fix: Run a 2-week look-ahead schedule with subs and suppliers every Friday.
Finance + operations
In construction, profit is decided job by job, and the books usually find out last. Blue Water works on both sides: a fractional CFO who keeps your numbers honest, and an operations team that fixes what those numbers reveal.
Finance · Fractional CFO
Operations · Friction & systems
The four leaks above are where the numbers usually point. Once the monthly review shows which one is costing you most, we fix it at the source: a clear procedure your team follows, a cleaner workflow, and the software you already use connected so nothing gets re-keyed or lost.
Then we track the result in your next month's numbers, so you can see what the fix was worth.
How the two sides work togetherThe diagnostic scores both sides. You'll see your financial control and operations scores, and which to fix first.
Start the free diagnosticEvery diagnostic scores the same six areas, so you can see where construction problems sit next to everyday ones.
If you leave a figure blank, the diagnostic estimates it from these typical values for residential construction. Your results show which numbers came from you and which are estimates. In a paid audit, we replace every estimate with your real books.
Planning assumptions used by our model, not guarantees. See the earnings disclaimer.